Rolls-Royce Archives
         « Prev  Box Series  Next »        

Five modifications to be carried out on the Spectre while it is in the shop.


Identifier  ExFiles\Box 4\1\  01-page122
Date  2nd October 1934
  
X4044

To HIC.

He/Rm. {William Robotham - Chief Engineer} 9/KW.2.10.34.

Further to our conversation, we have agreed you will carry out the following modifications to the Spectre(Codename for Phantom III) this time while it is in the shop :-

(1) Hydraulic tappets (some not functioning).
(2) Hand two carbs. over to Salt.
(3) Increased transverse lean to pivots.
(4) Oil cooler removed. Larger pipe fitted.
(5) Oil filter for auto. adjusting tappets.

He/Rml
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙