Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Steering and timing gear specifications for the Wraith III chassis.

Identifier  ExFiles\Box 136\1\  scan0230
Date  15th July 1937
  
To HPS.{Horace Percy Smith - Experimental Factory Mgr} from Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}

11JS{Mr Johnson's Secretary}

Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}22/AP.15.7.37

WRAITH III. STEERING AND TIMING GEAR SPECIFICATIONS.

Will you please build all future Wraith III. chassis with the following features.

(1) Steering ball joints to Rm.{William Robotham - Chief Engineer}337/8/9 steering system otherwise to LOP.

(2) Timing gears as specified in memos Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}3/R.22.6.37 and Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}8/AP.29.6.37.

Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer}
  
  