Rolls-Royce Archives
         « Prev  Box Series  Next »        

Engine work priorities, delaying work on engine 9.B.V. and prioritizing two B.60 engines.


Identifier  ExFiles\Box 98\4\  scan0142
Date  7th March 1940
  
Hood

To HPS {Horace Percy Smith - Experimental Factory Mgr} /RH. {R. Hollingworth} from Rm. {William Robotham - Chief Engineer}

Rm. {William Robotham - Chief Engineer} 11/MH. {M. Huckerby} 7.3.40.

9.B.V.

With reference to HPS {Horace Percy Smith - Experimental Factory Mgr} /RH. {R. Hollingworth} 1/SW.6.340, we are particularly anxious not to dissipate our energies by doing work twice.

Under the circumstances, we will wait for the engine for 9.B.V. until the new flywheel to PL.109 is available.

You will appreciate that the two B.60's (Nos.1 and 3) are No.1 priority with regard to engine units.

Rm. {William Robotham - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙