Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Fitting a B.60 No. 3 Engine Unit into 9.B.V., noting a delay due to a lack of flywheel drawings.

Identifier  ExFiles\Box 98\4\  scan0141
Date  6th March 1940
  
Hood.

To Rm.{William Robotham - Chief Engineer}

HPS{Horace Percy Smith - Experimental Factory Mgr}/RH.{R. Hollingworth}1/SW.6.3.40.

9.B.V.

In reply to Rm{William Robotham - Chief Engineer}/CTS.{C. Trot Salt - Carburation}11/ML.5.3.40, re. fitting of B.60 No. 3 Engine Unit into 9.B.V., the controlling feature will be the new flywheel PL.109. We have explained to Rm{William Robotham - Chief Engineer}/CTS{C. Trot Salt - Carburation} there is no detail drawing for this piece and he is going to follow this up, in the meantime forgings are being obtained.

As the above appears to be a long distance job, suggest engine should be rebuilt and fitted to Chassis, and changed over when Flywheels are available.

HPS{Horace Percy Smith - Experimental Factory Mgr}/RH.{R. Hollingworth}

RH.{R. Hollingworth}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙