Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Method for checking and regaining preload on pinion bearings.

Identifier  ExFiles\Box 102\4\  scan0164
Date  10th September 1937
  
DIMENSION A SHOULD BE 0 TO .001" MORE THAN B. BEARING MUST NOT HAVE SLACK.
METHOD OF CHECKING PRELOAD ON PINION BEARINGS
L.H. VIEW SHOWS MEASUREMENT OF ASSEMBLED WIDTH OF OUTERS.
R.H. VIEW SHOWS MEASUREMENT OF WIDTH OF OUTERS AFTER INNER RACE HAS BEEN REMOVED.
TO BE DONE AT R & M.{Mr Moon / Mr Moore}
TO REGAIN PRELOAD IN A BEARING THAT HAS DEVELOPED SLACK, GRIND NECESSARY AMOUNT AT X OFF JOURNAL OUTER, ENSURING BY MICROMETER MEASUREMENT OF Y THAT METAL HAS BEEN REMOVED UNIFORMLY.
ROLLS-ROYCE, LTD.
PRINT ROOM
10 SEP 1937
DERBY.
RM.{William Robotham - Chief Engineer}444
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙