From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Discussion with Birmingham Aluminium Co. about more economical production of aluminium castings for the Phantom III.
Identifier | ExFiles\Box 142\4\ scan0109 | |
Date | 1st June 1938 | |
DY{F R Danby}/MS Rm.{William Robotham - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} HPS.{Horace Percy Smith - Experimental Factory Mgr} 1262 BY.11/G.1.6.38. PHANTOM 111. RE: PRODUCTION OF ALUMINIUM CASTINGS MORE ECONOMICALLY. RHC.{R. H. Coverley - Production Engineer} and myself discussed the above matter with Mr. Raby of Birmingham Aluminium Co. We told him we were prepared to modify both the alloy used and the method of moulding, even if it meant a new pattern if real economies could be achieved. Mr. Raby was not able to make any helpful proposals, the above suggestions were turned down, as he said it was true of any alloy, and he could not offer any positive suggestion for better moulding technique. BY.{R.W. Bailey - Chief Engineer} By | ||