Instructions and sketches for the 40/50 HP tyre pump mounting and control mechanism on armoured cars.
| Identifier | ExFiles\Box 77\4\ scan0067 | |
| Date | 21th October 1920 | |
| To Da. {Bernard Day - Chassis Design} from E. {Mr Elliott - Chief Engineer} Copy to CJ. " " Bn. {W.O. Bentley / Mr Barrington} " " Hs. {Lord Ernest Hives - Chair} " " By. {R.W. Bailey - Chief Engineer} " " EFC. {E. Fowler Clarke - Electrical Engineer} X.4194. E7/G21.10.20. X.4197. RE 40/50 H.P. TYRE PUMP MOUNTING. We send you herewith drawing No. Lec.1295 shewing the above. The control for this pump should be arranged at Derby to suit the armoured cars, and should be as shewn in the sketch below:- [Sketch 1 Labels] STOP SPRING A [Sketch 1 Caption] WEAK SPRING TO KEEP PUMP DISENGAGED & TO DISENGAGE PUMP [Sketch 2 Labels] PEG RING When it is desired to engage the pump the ring shewn at the end of the wire on the dashboard should be lifted on to the peg immediately above it. This can be done with the engine turning, or not turning, owing to the presence of the spring "A". If the gears will not engage with the engine standing, the spring "A" will turn them into engagement the moment the engine commences to turn. The idea is that when the driver wishes to pump up he engages the pump gearing by turning over the engine with the electric starter. Some modifications to the Tyre pump drawing Lec.1294 are shewn on Kec.1295, which modifications provide for an oil filler and drain. Contd. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
