Rolls-Royce Archives
         « Prev  Box Series  Next »        

List of required coachbuilders drawings for model 3.R.2, with a note on which schemes should be prioritized.


Identifier  ExFiles\Box 117\4\  scan0264
Date  28th February 1944 guessed
  
Continued:-

-2-

To complete the list of coachbuilders drawings applicable to 3.R.2., schemes are required covering the following :-

(1) + 2nd Crossmembers.
(2) Starting handle and bracket.
(3) Radiator.
(4) Radiator shell.
(5) + Spare wheel mounting (Rear)
(6) Wing stays, lamps and horns.
(7) + Petrol tank.
(8) + Bonnet dimensions, front of car.
(9) Front bumper and bracket.
(10) Rear bumper and bracket.
(11) + Petrol filler.
(12) + Scuttle clearance for bonnet hinge.
(13) + Dashboard and contour.
(14) + Bonnet Valence strip.
(15) Front apron.
(16) Front apron detail.
(17) + Diagonal stays.
(18) + Exhaust swan neck.
(19) Instrument Board.
(20) + Bonnet eye.

Schemes marked + should, it is suggested, be given priority.

Ev {Ivan Evernden - coachwork} /WHH.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙