From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for the deletion of the window in the float chamber to prevent leaks.
Identifier | ExFiles\Box 172\1\ img078 | |
Date | 16th March 1926 | |
RR 755 (10M) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225 ORIGINAL COMPLETED. 16.3.26. STANDARDISATION of CHASSIS PARTS. Date 5326 X No. 5080 Drawing No. Part List Description of Parts: DELETION OF WINDOW IN FLOAT CHAMBER. Origin: To avoid leaks. Experimental Test Report: It has been recommended that we delete the window in the float chamber on the 20 HP. because of the trouble with leakage. We consider the leakage trouble could be overcome but as we have no window on the Phantom carburetter and have not wanted one, we consider the window can be deleted to advantage. Road Test Report: Several 10,000 miles were run on 20 HP. carburetters without windows in float chamber - this was a later modification. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £1. 11. 10d. Weight of New Part. Cost of New Part. £1. 10. 9d. Difference per Car. Difference per Car. £ --. 1. 1d. saving. Cost of Parts in Works which will be scrapped if commenced on:- Series ........ £....... Series ........ £....... Series ........ £....... Signature of Mr. De LOOZE that above is correct. Wv/Rms. 11.3.26 SIGNATURES | DATE | REMARKS MR. JOHNSON | 16.3.26 | Agreed. C.Johnson. MR. B. JOHNSON | 16.3.26 | Agreed. B.J. MR. ROYCE | 8/3/26 | Agreed FHR MR. WORMALD | 5.3.26 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 5.3.26 | Agreed. Rg.{Mr Rowledge} MR. DAY | 8.3.26 | Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY | 8.3.26 | Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 5.3.26 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 8.3.26 | Agreed. E.{Mr Elliott - Chief Engineer} MR. NORTHEY MR. HIVES | 15.3.26 | Agreed. E.Hives. STAMP: CHASSIS | ||