From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation form for a new chassis part, detailing the first chassis for fitting, test date, and associated costs.
Identifier | ExFiles\Box 15\5\ Scan048 | |
Date | 3rd November 1928 | |
STANDARDISATION of CHASSIS PARTS OPTION X The number of the first chassis on which the new part will be fitted. G.2.B. Date when chassis will be handed to test. 3.11.28 Cost of scrapped material, if any. £9 Cost of jigs and tools. £3 Approval Table: INITIAL | DATE | REMARKS LB | 28.9.28 | Passed. JA A | 3.9.28 | Passed. EHV ROW | 4.7.28 | Passed. WOL DR | 7.9.28 | Passed. DH{D. Henderson - Showroom} AG | 8.9.28 | Passed. AC YB | 4.7.28 | Passed. ME E3 | 6.9.28 | Passed. TS. It should be pointed out that with this modification the maximum adjustment is reduced. E | 8.9.28 | Passed. H HW | 12.9.28 | Passed. MERY HW SWO | 12.9.28 | Passed. OWS EH | 21.9.28 | Passed. HB{C. E. Harcombe} | ||