Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation form for a new chassis part, detailing the first chassis for fitting, test date, and associated costs.

Identifier  ExFiles\Box 15\5\  Scan048
Date  3rd November 1928
  
STANDARDISATION of CHASSIS PARTS

OPTION X

The number of the first chassis on which the new part will be fitted. G.2.B.
Date when chassis will be handed to test. 3.11.28
Cost of scrapped material, if any. £9
Cost of jigs and tools. £3

Approval Table:
INITIAL | DATE | REMARKS
LB | 28.9.28 | Passed. JA
A | 3.9.28 | Passed. EHV
ROW | 4.7.28 | Passed. WOL
DR | 7.9.28 | Passed. DH{D. Henderson - Showroom}
AG | 8.9.28 | Passed. AC
YB | 4.7.28 | Passed. ME
E3 | 6.9.28 | Passed. TS. It should be pointed out that with this modification the maximum adjustment is reduced.
E | 8.9.28 | Passed. H
HW | 12.9.28 | Passed. MERY HW
SWO | 12.9.28 | Passed. OWS
EH | 21.9.28 | Passed. HB{C. E. Harcombe}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙