On the testing of a condenser from chassis 38-ZG, finding it operational but recommending a new earthing connection to remedy a fault.
| Identifier | ExFiles\Box 46\3\ Scan248 | |
| Date | 1st April 1924 | |
| X 2417 To BY {R.W. Bailey - Chief Engineer} /RD. from EFC. {E. Fowler Clarke - Electrical Engineer} c. EP. {G. Eric Platford - Chief Quality Engineer} EFC {E. Fowler Clarke - Electrical Engineer} 2/T2.4.24. X.2512 - CONDENSER FROM CHASSIS 38-ZG. In accordance with your By {R.W. Bailey - Chief Engineer} /RD9/ML1.4.24, we have tested this condenser to our standard specification and find it to be O.K., the capacity at 18ºC being .204 mf. The trouble referred to in EP {G. Eric Platford - Chief Quality Engineer} 's note EP {G. Eric Platford - Chief Quality Engineer} /CEP8/H31.3.24 will probably be remedied if the new standardised earthing connection is fitted, it being considered that the faulty earthing connection has probably been the cause of the failure. We return the condenser herewith. EFC. {E. Fowler Clarke - Electrical Engineer} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
