Progress on a lighter clutch, flywheel, propeller shaft, joints, and gearbox modifications.
| Identifier | WestWitteringFiles\O\January1926-March1926\ Scan94 | |
| Date | 9th March 1938 | |
| (2) We postponed the work on (a) because an aluminium dash was in progress, which controlled the job to a certain extent. We would like your sanction for (b) in due course. LIGHTER CLUTCH & FLYWHEEL. This has been instructed many months. PROPELLER SHAFT & JOINTS. The Mechanic's joints which were to be tested on the first car have been instructed. The designs of the improved oil retaining type we have in progress. Regarding the gearbox we have not yet commenced the design of the India(Production 20 HP. with 4-speed box and Front Wheel Brakes) type for EAC. 7., but will make this the next job after completing the modifications to India(Production 20 HP. with 4-speed box and Front Wheel Brakes) gearbox for lowering floorboards, which scheme we are issuing tomorrow. AJS. [Stamp Text: RECEIVED 9 MAR 1938 H.O.] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).