Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Instruction deadlines for held-up details and future modifications for the 25/30-HP 'R2' Series chassis.

Identifier  ExFiles\Box 142\2\  scan0391
Date  12th January 1937
  
BY/Ugn.
c. to RWS.
c. to Rm.{William Robotham - Chief Engineer}

r 1200

ROY{Sir Henry Royce}/MS25/P.12.1.37.

25/30-HP CHASSIS - "R2" SERIES.

With reference to the various details held up on the above Series, as the first chassis is due to test August 7th, if the Works are to continue output without break it is necessary the Order Office have instructions for the various items held up not later than January 23rd.

If it is decided to bring in modifications on the 101st chassis we should have instructions to order such details not later than March 13th.

Roy.{Sir Henry Royce}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙