Standardisation of a two-level reserve compartment in the rear petrol tank.


Identifier  ExFiles\Box 171\1\  img206
Date  2nd June 1930
  
RR 785 REVISED (10H) (DG 346 19-7-29) BM. 5/543.
COMPLETED 26. 8. 30. ORIGINAL
STANDARDISATION OF CHASSIS PARTS.
Date 2.6.30.
X No. 7460
Drawing No.
Part List

Description of Parts: Two-level reserve compartment in rear tank.
Origin: Sales request, to supply a greater reserve of petrol.
Experimental Test Report: This was standard on Phantom l. We propose to use the same scheme on Phantom ll.
Road Test Report:

[Right Side Options]
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......

Weight of Old Part: Cost of Old Part: £ 1. 7. 4d.
Weight of New Part: Cost of New Part: £ 2. 4. 9d.
Difference per Car: Difference per Car: £ - 17. 5d. Increase
Signature from Cost Dept. that above is correct: CN. {Mr Chamberain} G. {Mr Griffiths - Chief Accountant / Mr Gnapp} Agreed Wor. {Arthur Wormald - General Works Manager}

[Central Watermark: PHANTOM]

[Approval Table]
INITIAL | DATE | REMARKS
BJ. Sg. {Arthur F. Sidgreaves - MD} | 23.8.30 | Agreed Sg. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 16/6/30 | Agreed. RMS.
WOR. {Arthur Wormald - General Works Manager} | 3.6.30 | Agreed Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 3.6.30 | Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 17.6.30 | Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 4.6.30 | Agreed BY. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 4.6.30 | Agreed EP. {G. Eric Platford - Chief Quality Engineer} if in conjunction with non-return valve on petrol supply feed pipe.
E. {Mr Elliott - Chief Engineer} | 14.6.30 | Agreed AE. EP. {G. Eric Platford - Chief Quality Engineer} & MX {John H Maddocks - Chief Proving Officer}
PN. {Mr Northey} | 11.6.30 | Agreed PN. {Mr Northey} Hope to see this on production soon as possible.
CWB. | 3.6.30 | Agreed C.
HS. {Lord Ernest Hives - Chair} | | Agreed
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙