Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The challenges and proposed process for overseeing coachbuilding work.

Identifier  ExFiles\Box 5\2\  02-page191
Date  22th March 1928 guessed
  
contd :- -2-

that the construction be closely watched for the following reasons :-

1. The coachbuilders cannot work to drawings.

2. The chassis is always a strange one, but they are never able to have it or see it.

3. They are not allowed to complete and mount the body.

We at WN. are not in a position to do this work, because of the difficulty of getting away at frequent intervals. Derby are situated differently.

We would set out the small scale drawing of the body, and for subframe bodies we would make the design of that part. Derby would be responsible for the body construction, in detail, weight and general finish.


DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙