From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts for the No.7 'Compact' Tyre Pump by E. Hill.

Identifier  ExFiles\Box 171\1\  img110
Date  29th August 1927
  
RR 755 REVISED (ION) (DE 649 9-12-26) 5M. 2/27
ORIGINAL COMPLETED 13.9.27
STANDARDISATION of CHASSIS PARTS.
Date 29.8.27
Description of Parts. No.7. "COMPACT" TYRE PUMP. (Makers E.Hill.)
X No. 993
Drawing No.
Part List
Origin. To Increase in efficiency and reduced cost.
Experimental Test Report.
This pump inflates the tyre in 30% less strokes than the std. pump, it also fits into the tool box very much more easily.
Road Test Report.
Our tests shew that this pump is an improvement in every way over the present standard "Kismet Junior".
Weight of Old Part. 7 lbs. 10 ozs.
Weight of New Part. 7 lbs. 12 ozs.
Difference per Car. 2 ozs. increase.
Cost of Old Part. £ 17s. 10d.
Cost of New Part. £ 14s. 0d.
Difference per Car. £ 3s. 10d. saving.
Signature from Cost Dept. that above is correct. G/Rb.{R. Bowen} 7.9.27.
Actions:
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........
INITIAL | DATE | REMARKS
B.J. | 13.9.27 | Agreed. B.J.
R.{Sir Henry Royce} | 6/9/27 | Agreed. MR Bucknall's like to raise this to the urgent matter of the jack for low press tyres
WOR.{Arthur Wormald - General Works Manager} | 29.8.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 5.9.27 | Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 7.9.27 | Agreed. DA.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 29.8.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 31.8.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 7/9/27 | Agreed E.E.A.
PN.{Mr Northey} | 29/11/27 | Agreed P.N.
CWB. | |
HS.{Lord Ernest Hives - Chair} | 29.8.27 | Agreed. Hs.{Lord Ernest Hives - Chair}
  
  