From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of roller bearings to the carburettor throttle to improve controls on the Phantom.

Identifier  ExFiles\Box 66a\3\  scan0109
Date  18th November 1926
  
RR 755 REVISED (10H) (DE 444 6-10-26) BM.
[Handwritten]: X 8140 Completed 13/12/26
STANDARDISATION of CHASSIS PARTS.
Date 18.11.26
Description of Parts: ROLLER BEARINGS TO CARBURETTER THROTTLE.
Origin: To improve controls.
Experimental Test Report: The Phantom governor controls at present have a definite lag due to friction. With the proposed modification the Phantom governor controls will be equal to the Silver Ghost.
Road Test Report: Fitted to 8-EX car. We recommend this modification is adopted at once. Before any cars are delivered fitted with this scheme, we shall have completed thousands of miles with it.
[Box Right]
X No. 8140 [Strikethrough] 8240
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.....
Series.........£.....
Series.........£.....
[End Box]
Weight of Old Part. Cost of Old Part. £
Weight of New Part. Cost of New Part. Cost included on sheet X.8080 £
Difference per Car. Difference per Car. X.8240 dated 20.11.26 £
Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 20.11.26
[Table]
INITIAL | DATE | REMARKS
BJ. | 13.12.26 | agreed BJ
R.{Sir Henry Royce} | 19.11.26 | Agreed, most urgent - fit to throttle and long governor shaft but not short one. FHR.
WOR.{Arthur Wormald - General Works Manager} | 18.11.26 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 18.11.26 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 19.11.26 | Agreed. DA.{Bernard Day - Chassis Design} Subject to roller bearings on throttle spindle standing petrol.
BY.{R.W. Bailey - Chief Engineer} | 18.11.26 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 20.11.26 | Agreed - recommend retrospective action to at any rate deal with complaints.
E.{Mr Elliott - Chief Engineer} | 19.11.26 | Agreed. E.{Mr Elliott - Chief Engineer} With modification to throttle spindle mentioned in R2/M18.11.26
PN.{Mr Northey} | 19.11.26 | Agreed, provided our object is satisfactorily achieved. PN.{Mr Northey}
CWB. | 19.11.26 | Agreed. CWB.
HS.{Lord Ernest Hives - Chair} | 18.11.26 | Agreed. Hs.{Lord Ernest Hives - Chair}
[Stamps: PHANTOM, RECEIVED DEC 1926]
  
  