Standardisation of a radiator with integral vertical shutters for the 20 HP chassis.
| Identifier | ExFiles\Box 172\1\ img117 | |
| Date | 23th May 1927 | |
| RR 75S REVISED (10H) (DE 649 9-12-26) BM. 2/1157. ORIGINAL COMPLETED 1.9.27 STANDARDISATION of CHASSIS PARTS. Description of Parts: RADIATOR WITH INTEGRAL VERTICAL SHUTTERS. Origin: To bring design in line with approved Phantom shutters. Experimental Test Report: Shutters are of good appearance, definite control, fitted to 10-G-111 and run 10,000 miles in France. Road Test Report: The shutters worked satisfactorily during the test. A slight binding in the control caused the starter carburetter to be opened when operating shutters otherwise the controls are satisfactory. Drawing No. N. Sch 2314, No. 2320, 2355 Part E. {Mr Elliott - Chief Engineer} 54230 List E. {Mr Elliott - Chief Engineer} 54240 Action Selected: C - Scrap present stock and replace on all Chassis not yet handed to test. Weight of Old Part: Cost of Old Part: £ 35. 18. 9 Weight of New Part: Cost of New Part: £ 38. 19. 9 Difference per Car: £ 3. 1. 0 increase. Signature from Cost Dept. that above is correct: My/Rb. {R. Bowen} 30.6.27. Approvals: INITIAL: B.J., DATE: 1.9.27, REMARKS: Agreed. B.J. INITIAL: R. {Sir Henry Royce} , DATE: 25/5/27, REMARKS: Agreed FHR INITIAL: WOR. {Arthur Wormald - General Works Manager} , DATE: 23.5.27, REMARKS: Agreed. Wor. {Arthur Wormald - General Works Manager} INITIAL: RG. {Mr Rowledge} , DATE: 30.5.27, REMARKS: Agreed. Rg. {Mr Rowledge} INITIAL: DA. {Bernard Day - Chassis Design} , DATE: 26.5.27, REMARKS: Agreed. DA. {Bernard Day - Chassis Design} The control pieces are the same as Phantom. Sticking might be eliminated by returning to the bush stopped from turning at the dashboard end as was originally instructed & is used on the Phantom. INITIAL: BY. {R.W. Bailey - Chief Engineer} , DATE: 25.5.27, REMARKS: Agreed. BY. {R.W. Bailey - Chief Engineer} INITIAL: EP. {G. Eric Platford - Chief Quality Engineer} , DATE: 24.5.27, REMARKS: Agreed. Except coachbuilders request circular fitts: for this control (and switchbox) to match other instrument board fittings. EP. {G. Eric Platford - Chief Quality Engineer} INITIAL: E. {Mr Elliott - Chief Engineer} , DATE: 25/5/27, REMARKS: Agreed CE INITIAL: CWB., DATE: 27.5.27, REMARKS: Agreed. CWB. INITIAL: HS. {Lord Ernest Hives - Chair} , DATE: 23.5.27, REMARKS: Agreed. Hs. {Lord Ernest Hives - Chair} Stamp: 20 H.P. CHASSIS | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
