Standardisation of a radiator with integral vertical shutters for the 20 HP chassis.


Identifier  ExFiles\Box 172\1\  img117
Date  23th May 1927
  
RR 75S REVISED (10H) (DE 649 9-12-26) BM. 2/1157.
ORIGINAL COMPLETED 1.9.27
STANDARDISATION of CHASSIS PARTS.

Description of Parts: RADIATOR WITH INTEGRAL VERTICAL SHUTTERS.
Origin: To bring design in line with approved Phantom shutters.

Experimental Test Report: Shutters are of good appearance, definite control, fitted to 10-G-111 and run 10,000 miles in France.

Road Test Report: The shutters worked satisfactorily during the test. A slight binding in the control caused the starter carburetter to be opened when operating shutters otherwise the controls are satisfactory.

Drawing No. N. Sch 2314, No. 2320, 2355
Part E. {Mr Elliott - Chief Engineer} 54230
List E. {Mr Elliott - Chief Engineer} 54240
Action Selected: C - Scrap present stock and replace on all Chassis not yet handed to test.

Weight of Old Part:
Cost of Old Part: £ 35. 18. 9
Weight of New Part:
Cost of New Part: £ 38. 19. 9
Difference per Car: £ 3. 1. 0 increase.
Signature from Cost Dept. that above is correct: My/Rb. {R. Bowen} 30.6.27.

Approvals:
INITIAL: B.J., DATE: 1.9.27, REMARKS: Agreed. B.J.
INITIAL: R. {Sir Henry Royce} , DATE: 25/5/27, REMARKS: Agreed FHR
INITIAL: WOR. {Arthur Wormald - General Works Manager} , DATE: 23.5.27, REMARKS: Agreed. Wor. {Arthur Wormald - General Works Manager}
INITIAL: RG. {Mr Rowledge} , DATE: 30.5.27, REMARKS: Agreed. Rg. {Mr Rowledge}
INITIAL: DA. {Bernard Day - Chassis Design} , DATE: 26.5.27, REMARKS: Agreed. DA. {Bernard Day - Chassis Design} The control pieces are the same as Phantom. Sticking might be eliminated by returning to the bush stopped from turning at the dashboard end as was originally instructed & is used on the Phantom.
INITIAL: BY. {R.W. Bailey - Chief Engineer} , DATE: 25.5.27, REMARKS: Agreed. BY. {R.W. Bailey - Chief Engineer}
INITIAL: EP. {G. Eric Platford - Chief Quality Engineer} , DATE: 24.5.27, REMARKS: Agreed. Except coachbuilders request circular fitts: for this control (and switchbox) to match other instrument board fittings. EP. {G. Eric Platford - Chief Quality Engineer}
INITIAL: E. {Mr Elliott - Chief Engineer} , DATE: 25/5/27, REMARKS: Agreed CE
INITIAL: CWB., DATE: 27.5.27, REMARKS: Agreed. CWB.
INITIAL: HS. {Lord Ernest Hives - Chair} , DATE: 23.5.27, REMARKS: Agreed. Hs. {Lord Ernest Hives - Chair}

Stamp: 20 H.P. CHASSIS
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙