Standardisation document for .375' thick front brake liners to increase their lifespan.

Identifier  ExFiles\Box 12\5\  05-page221
Date  5th July 1930
  
RR 785 (10M) (3-7-30) BM. 6/2871. COMPLETED 7.10.30. X 7420
STANDARDISATION of CHASSIS PARTS. Date 5.7.30.

Description of Parts. FRONT BRAKE LINERS .375" THICK.

Origin. To increase the period before re-lining is necessary.

Experimental Test Report.
The present lining has to be thrown away when half worn or the rivet heads foul the drum. The proposed lining will give 80% more life.

Road Test Report.
Run 10,000 miles on 23-EX. Now running 10,000 miles on 24-EX.

X No. 7361. 7420.
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £
Cost of New Part. £ Included in Std. Sheet X.3806/7350/7420
Difference per Car. £

Cost of Parts in Works which will be scrapped if commenced on :-
Series..........£.........
Series..........£.........
Series..........£.........

Signature from Cost Dept. that above is correct.

INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 6.10.30 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 9.7.30 | Agreed FHR. - Would our staple system of fixing be better or less costly for fixing liners?.
WOR.{Arthur Wormald - General Works Manager} | 8.7.30 | Agreed Wor.{Arthur Wormald - General Works Manager}
C. | 8.7.30 | Agreed C..
RG.{Mr Rowledge} | 8.7.30 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 8.7.30 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 8.7.30 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 9.7.30 | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 12.7.30 | Agreed AE - does not this also apply to the back brake liners?.
PN.{Mr Northey} | | Agreed PN.{Mr Northey}
Hs.{Lord Ernest Hives - Chair} | | Agreed C.
  
  