Standardisation proposal for altering the angular position of Goshawk dynamo main brushes.

Identifier  ExFiles\Box 50\5\  Scan180
Date  3rd May 1923
  
R R 715 (S H) (S H 268, 20-2-20) G 8534
(X4333A)
COMPLETED 23:5:23.
STANDARDISATION of CHASSIS PARTS.
Date 3.5.23.
X No.4333A
Drawing No.
Part List

Description of Parts.
Altered angular position of Goshawk dynamo main brushes by which they are 9° retarded from no load neutral position, in place of 2° as heretofore.

Origin.
Desirability of improving the to the last ounce the output and commutation of the Goshawk dynamo, a protracted series of bench tests having been taken with this end in view and reported in our EFC {E. Fowler Clarke - Electrical Engineer} 1/T3. 5. 23.

Experimental Test Report.
See EFC {E. Fowler Clarke - Electrical Engineer} 1/T3. 5. 23.

Road Test Report.
The dynamo on 7-G-11 is at once being altered in this manner so as to be subject to the 10,000 mile road test which is being carried out on this chassis in connection with coarser teeth on rear axle bevels.

[Right Panel Options]
A Scrap and replace at all costs including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series......... £.........
Series......... £.........
Series......... £.........
Storekeeper advised re above:
Storekeeper's Signature.

[Main Body]
Signature of Exp. Dept. that above is correct. EFC {E. Fowler Clarke - Electrical Engineer} /Hs. {Lord Ernest Hives - Chair}
Weight of Old Part. Cost of Old Part. £---
Weight of New Part. Cost of New Part. £---
Difference per Car. Difference per Car. £---
Signature of Mr. De LOOZE that above is correct.

[Signatures Table]
SIGNATURES | DATE | REMARKS
Mr. JOHNSON | 14 May | agreed Johnson
Mr. B. Johnson. | 14.5.23 | Agreed. FHR.
Mr. ROYCE | 17.5.23 | It is very urgent and necessary to make the brush contact more reliable see my memos.
Mr. WORMALD | 3.5.23 | Agreed, subject to road test. Wor. {Arthur Wormald - General Works Manager}
Mr. BARRINGTON (struck through) | 3.5.23 | Agreed. Rg. {Mr Rowledge}
Mr. ROWLEDGE. | 4.5.23 | Agreed. Da. {Bernard Day - Chassis Design}
Mr. DAY | 3.5.23 | Agreed. BY. {R.W. Bailey - Chief Engineer}
Mr. BAILEY | 3.5.23 | Agreed. BY. {R.W. Bailey - Chief Engineer}
Mr. PLATFORD | 3.5.23 | Agreed if hs. {Lord Ernest Hives - Chair} satisfied O.K. on cars. EP. {G. Eric Platford - Chief Quality Engineer}
Mr. NORTHEY | 11.5.23 | Agreed. PN. {Mr Northey}
  
  