Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Suggestion to reduce the cost of the 25 HP chassis by simplifying the battery box wiring.

Identifier  ExFiles\Box 164\4\  img009
Date  9th February 1931
  
X5535
9.2.31.

Extract from list of suggestions made to reduce the cost of the 25 HP. chassis.

X.5535.
BATTERY BOX WIRING.
X.6055.

The wiring to the 20/25 battery box is completely enclosed in flexible metallic tubing, unions and bakelite mouldings. P2. has no such protections, the cables being led from the frame channel through a hole in the battery box side. If P.2. practice were adopted we could save

Material 4. 8 1/2
Nett labour 1. 7 1/2
Total nett saving. 6. - 4.

Da. {Bernard Day - Chassis Design} stated that N. sch. 3169 shews this and we can go ahead and standardise in the usual way.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙