Modifying the crankshaft finish to reduce costs and testing a newly finished crank.


Identifier  ExFiles\Box 132\1\  scan0038
Date  25th March 1938
  
Rm {William Robotham - Chief Engineer} 1116.

BY.13/G.25.3.38.

Handwritten top left:
R= Bearings already reamed - Fitted to existing crank. Could try when we do a further test with die cast big ends ACQ. At present only centricast ACQ big ends are available Rm {William Robotham - Chief Engineer} / SWDL {Len H. Swindell}

Distribution List:
HPS. {Horace Percy Smith - Experimental Factory Mgr}
c. Rm. {William Robotham - Chief Engineer}
c. RHC {R. H. Coverley - Production Engineer} /SB. {Mr Bull/Mr Bannister}
c. RHC {R. H. Coverley - Production Engineer} /CAN.

Handwritten in red:
SWDL {Len H. Swindell}
Trying to get this crank in the Bearing engine Rm {William Robotham - Chief Engineer}

Typed Text:
CRANKSHAFT FINISH.

As a result of discussing the finish of the crankshafts with the Works from the point of view of reducing cost and removing unnecessary operations, I have agreed tentatively that the sides of the webs should be left with a turned finish, and have arranged with Rm. {William Robotham - Chief Engineer} that the engine which is just going on for test should be fitted with one of the cranks in question.

RHC {R. H. Coverley - Production Engineer} /SB. {Mr Bull/Mr Bannister} is finishing off a crank on the new footing, and this will be supplied in the course of a day or so. It should be fitted in the engine which is being built for endurance testing for certain other parts.

BY. {R.W. Bailey - Chief Engineer}

Handwritten initials:
BM
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙