From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardization of chassis parts, detailing testing, costs, and department approvals.
Identifier | ExFiles\Box 171\2\ img063 | |
Date | 10th October 1932 | |
The text below includes mirrored text from the reverse side of the document, as well as typed and handwritten text from the primary side. Mirrored text: STANDARDIZATION OF CHASSIS PARTS STRAP 2/ Date. 10.10.32 Description of Part NEW TYPE TO BE FITTED Drawing No. Original Reason for Improvement Typed and Handwritten Text: The number of the first chassis on which the new part will be fitted.................... then available. Date when chassis will be handed to test.................... Cost of scrapped material, if any.................... Nil. Cost of jigs and tools.................... Nil. W'ks M'g'r to Old Part ....... C-13-89 W'ks M'g'r to New Part ....... C-19-40 NOTES 2 mins ..... 2 RUN Substitute from Stock dept. that above is correct. J.T. 26.11.12 Approval Table: INITIAL | DATE | EXAMINER SC | 29.10.12 | Passed S.C. R | 29.10.12 | Passed R WOB | 29.10.12 | Passed W.O.B. C | 31.10.12 | Passed C. DR | 29.10.12 | Passed D.R. AQ | 1.11.12 | Passed A.Q. YB | 28.10.12 | Passed Y.B. EB | 29.10.12 | Passed E.B. E | 29.10.12 | Passed E.{Mr Elliott - Chief Engineer} MW | 1.11.12 | Passed (Detail) Finished M.W. AH | 2.11.12 | Passed A.H. | ||