From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Oversight and suggested modifications to the EAC 7 chassis brake operation.
Identifier | WestWitteringFiles\P\2October1926-December1926\ Scan107 | |
Date | 16th December 1926 | |
TO (crossed out) BY.{R.W. Bailey - Chief Engineer} FROM DA.{Bernard Day - Chassis Design} Copy to - BJ. HS.{Lord Ernest Hives - Chair} ORIGINAL DA{Bernard Day - Chassis Design}3/M16.12.26. EAC. 7. BRAKE OPERATION. 7420 (crossed out) X7310 Replying to BY4/H81226., we see that we have made an oversight in putting the taper pegs not at right angles to the split as we intended to do. We have corrected this on N. scheme 2325. which we send herewith. With reference to the dismantling of the small countershaft we see that it would be a convenience to be able to take this down independently of the equalising gear, and on this same drawing we have shewn how we suggest it might be done. We suggest that this should be incorporated in the existing EAC. 7. chassis. You are perhaps aware that the whole of the gearbox for EAC. 7. is being revised, resulting in a general reduction of size, and as this will inevitably modify practically the whole of the brake operation, it will be understood that the arrangements shewn on N. schs. 2250. 2274. and 2325. do not apply to future production. DA.{Bernard Day - Chassis Design} | ||