From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, proposing a change of piston material from alloy No. 221 to RR. 53.

Identifier  ExFiles\Box 15\3\  Scan048
Date  4th September 1930
  
RR 785 (10M) (3-7-30) BM. 6/2571.
X7040. COMPLETED 7.10.30.
STANDARDISATION of CHASSIS PARTS.
Description of Parts. PISTONS MADE IN RR.53 ALLOY
Origin. To improve material.
Experimental Test Report. The proposal is to change from alloy No. 221 to RR. 53
Road Test Report. 20 sets of pistons have been fitted to production chassis and have gone through tests satisfactorily.
Date 4.9.30.
X No. 7040
Drawing No. 5040
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
PHANTOM II 20/5HP
Weight of Old Part.
Cost of Old Part. £2-4-9 / 1-8-6
Weight of New Part.
Cost of New Part. £2-3-1 / 1-7-9
Difference per Car. £0-1-8 Decrease / 0-0-9 Decrease
Signature from Cost Dept. that above is correct. G.RL 24/9/30 GJS 25/9/30
Cost of Parts in Works which will be scrapped if commenced on :-
Series..........£......
Series..........£......
Series..........£......
INITIAL DATE REMARKS
SG.{Arthur F. Sidgreaves - MD} 6-10-30 Agreed by Ref SG{Arthur F. Sidgreaves - MD}32/E27-9-30 & HS{Lord Ernest Hives - Chair}3/MJ.3-10-30.
R.{Sir Henry Royce} 9.9.30 Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} 5.9.30 Agreed Wor.{Arthur Wormald - General Works Manager}
C. Agreed C.
RG.{Mr Rowledge} 8.9.30 Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} 8.9.30 Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} 5.9.30 Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} 6.9.30 Agreed EP.{G. Eric Platford - Chief Quality Engineer} Assume 10,000 miles test has been made and O.K.
E.{Mr Elliott - Chief Engineer} 9.9.30 Agreed AE.
PN.{Mr Northey} 9.9.30 There is no indication on what grounds the change is suggested. PN.{Mr Northey}
HS.{Lord Ernest Hives - Chair} Agreed Hs.{Lord Ernest Hives - Chair}
[STAMP: PHANTOM II CHASSIS]
[STAMP: RECEIVED 30 SEP]
  
  