Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Suggesting a solution for loose cut-out contact points by soldering them after riveting.

Identifier  ExFiles\Box 50\1\  Scan115
Date  15th March 1926
  
X4105
To EFC. {E. Fowler Clarke - Electrical Engineer}
BY {R.W. Bailey - Chief Engineer} /RD3/ML15.3.26.

CUT-OUT CONTACT POINTS.

We have had several cases of trouble of loose contact points on the cut-out, due to poor riveting and as there appears to be some difficulty in obtaining two perfectly flat surfaces to rivet together, I suggest that after riveting, the rivet head, washer and spring end are just blobbed with solder, similar to our condenser connections.

I have had one done in this manner and would like you to give same a test, at the moment Mr Brock is running it on his rig but has agreed to hand it over if you will send for it, we could then consider making this a standard method of fastening these points.

BY {R.W. Bailey - Chief Engineer} /RD.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙