Rolls-Royce Archives
         « Prev  Box Series  Next »        

Valve material tests, detailing clearance changes under heat and load conditions.


Identifier  WestWitteringFiles\O\2April1926-June1926\  Scan026
Date  22th April 1926 guessed
  
contd :-
-2-

| Material. | Valve. | Increase of clearance at 80°C (water and oil) relative to clce. when eng. cold. |
|---|---|---|
| Std.steel. | Inlet. Exh. | .006" to .007" |
| Corronil (Monel) | Inlet. Exh. | .004" |
| Brass. | Inlet. Exh. | -.004" to -.005" |
| Drawn Phos. Bronze. | Inlet. Exh. | 0 |
| Gunmetal BZ/G. | Inlet. Exh. | 0 to -.002" |
| Cast Phos. Bronze. BZ/PC. | Inlet. Exhaust. | 0 to -.002" |

The - ve. sign represents a decrease of the initial clearance.

It is seen that the BZ/PD behaves very satisfactorily under light load conditions.

We are continuing the tests to find out how the clearance of the drawn phosphor bronze rods is influenced by full load.

A set is also being tested on a car.

Hs. {Lord Ernest Hives - Chair}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙