Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Minutes of a daily conference from 13th May 1920, discussing water jacket covers, radiators, and wood wheel hubs.

Identifier  ExFiles\Box 18\6\  Scan093
Date  14th May 1920
  
Hr/M.{Mr Moon / Mr Moore} 14th May 1920.

MINUTES OF DAILY CONFERENCE.

13TH MAY 1920.
____________________________

Present:- Copies to:-
Wor.{Arthur Wormald - General Works Manager} R.{Sir Henry Royce}
Hr. CJ.
Wd.{Mr Wood/Mr Whitehead} C.
Hy.{Tom Haldenby - Plant Engineer} Bn.{W.O. Bentley / Mr Barrington}
EP.{G. Eric Platford - Chief Quality Engineer} BY.{R.W. Bailey - Chief Engineer}
Hs.{Lord Ernest Hives - Chair}
Hm.{Capt. W. Hallam - Head Repairs}
Wor.{Arthur Wormald - General Works Manager}
Hr.
Wd.{Mr Wood/Mr Whitehead}
Hy.{Tom Haldenby - Plant Engineer}
EP.{G. Eric Platford - Chief Quality Engineer}
_________________________________________________________________

(1) WATER JACKET COVERS.

A note from Mr.Royce was read, saying it was
absolutely ridiculous that we could not get Water
Jacket Cover castings. He said surely we could
make them ourselves. He stated he did not approve
of gunmetal because of the extra weight and the
fact that it has a different temperature coefficient
and therefore more likely to leak in time than the
cast iron.

Our Foundry is making some and is making them
without much difficulty - as many as the capacity
of the foundry will hold. Generally speaking we do
not think there is likely to be any more trouble.
We are also likely to get a supply from Wallworks.

(2) RADIATORS.

Would Hy.{Tom Haldenby - Plant Engineer} get out an approximate cost of machinery
and tools for the making of radiators.

(3) WOOD WHEEL HUBS FOR TEST CHASSIS FOR AMERICA.

Mr. Swift hopes to be able to supply EP.{G. Eric Platford - Chief Quality Engineer} early next
week with a few sets of rear Wood Wheel Hubs, but he
is waiting on Wd.{Mr Wood/Mr Whitehead} for flanges from outside.

Wd.{Mr Wood/Mr Whitehead} is going to give Wor.{Arthur Wormald - General Works Manager} necessary information
during the course of today, with regard to these
flanges.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙