Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Progress report and action list for various vehicle components, likely for the 'Wraith' model.

Identifier  ExFiles\Box 174\3\  img106
Date  5th November 1936
  
WRAITH

2nd. MOTION SHAFT - Gry{Shadwell Grylls} to have schemes issued by 10th.
LUB. OF SHAFTS.
GEAR CUTTING TACKLE - Promise by Cassell.
CHANGE SPEED & HAND BRAKE. - Gry.{Shadwell Grylls} to get details by the 10th.
SERVO DRIVE. - Details. Cassell to have forging position by 10th.
SPEEDO. DRIVE. - Position 10th.
SERVO LEVERS. - Martindale to have report on simplification by 10th.
AXLE. - 20/25 axle. Rm.{William Robotham - Chief Engineer} to see B and get drawings released for tubes and anchorage brackets.
Brake gear also to be released by the 10th.
Promise patterns 21st. Inst.
CRANKCASE. - Patterns.
WHEELCASE. - No promise.
FRAME. - Gry.{Shadwell Grylls} to go over with Butterworth before Tuesday 10th.
Position. Forging promises to be in at the same time.
SPRINGS. - Lea. to give promise in a weeks time.
(Rear) Springs brackets. Cassell to get date from D.O.
FRONT SUSPENSION. - Forgings. Next week Cassell to have dates.
STEERING. - Cassell. Ferd lever promises & Cross Steering.
REAR SHOCK DAMPERS. - Forgings and casting Cassell.
GEARBOX. - Pattern 14.11.36 completion.
Selectors. Cassell Forgings.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙