From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Estimate for Scheme D detailing costs for the extension of the Experimental Department.
Identifier | ExFiles\Box 33\1\ Scan134 | |
Date | 15th January 1923 | |
Hy{Tom Haldenby - Plant Engineer}4/HC15.1.23. EXPERIMENTAL DEPARTMENT ESTIMATE SCHEME D.{John DeLooze - Company Secretary} (1) Build 6 standard 24' x 32' bays on to the end of the Experimental Dept. between the outer wall and the Addison Road boundary fence, in position shown marked (2) on drawing Z.61 - £2,400 0 0 (2) Excavate for and build 2 Inspection Pits 24' long, standard pattern, with drain connections and cover boards - 104 0 0 (3) Heating Installation - 80 0 0 (4) Lighting Installation - 76 0 0 (5) Sprinkler Installation - 192 0 0 (6) Benching - 128 0 0 (7) Removal and arrangement of plant and machinery in Experimental Department, including heating and lighting installations - 400 0 0 (8) Additional crane girders and rails - 131 0 0 £3,511 0 0 Add 10% for contingencies - 351 0 0 TOTAL.............. £3,862 0 0 | ||