From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Status report on designs awaiting clearance by H.S.
Identifier | ExFiles\Box 6\6\ 06-page164 | |
Date | 11th March 1937 guessed | |
DESIGNS NOT YET CLEARED BY H.S. SECTION. | REMARKS. --- Starting handle. | In hand. Front brake equali-sing gear. | Cross Steering tube. | Spr. Suspn. mech. front wheels. | Schemes issued for mock-up arrangement. Front brakes. | Front Hub. | Wing stays & Ftgs. | In hand. Side Steering Tube. | Dash, brackets and floorboards. | In hand, dash and brackets cleared. Petrol piping and fittings. | In hand. Oil Piping. (Central Lubricn.) | In hand. Pressure piping for hydraulic jacks. | Awaiting report from Expl.Dept. on Jackall jacks. Pressure piping for damper control. | In hand. | ||