The design and testing of a stud arrangement for fixing the Goshawk II gear box brake quadrant.
| Identifier | ExFiles\Box 75\1\ scan0223 | |
| Date | 27th April 1921 | |
| To B.Y. from R. {Sir Henry Royce} c. to C.J. c. to Da. {Bernard Day - Chassis Design} c. to Hs. {Lord Ernest Hives - Chair} (4247) X.4247 - GOSHAWK(Aero Engine)(Codename for 20HP Car / Aero Engine after Kestrel(Aero Engine)) II - GEAR BOX. With reference to your suggestion of fixing the brake quadrant by studs and nuts, this scheme was naturally thought of at the time the designs were made, but as it was impracticable to use a nut on one of the studs, we considered the bolts, as shewn, the best solution, both alike for uniformity. It is intended that the keyways should only be very shallow, in fact very small indeed, so that the broaching of the grooves in the bolts would be quite an easy matter. Perhaps we were slightly timid as to the value of tapped holes in aluminium, and it may be advisable for us to test enough for this purpose and position. Moreover, if one of the studs only had a nut at the back this should give sufficient security for no harm in case the studs were somewhat defective through bad workmanship. I think, therefore, we had better test out the simple stud arrangement, fitting the one that permits of it with a nut. R. {Sir Henry Royce} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
