Standardisation of an ignition coil with a finer primary winding (Redmanol Case).

Identifier  ExFiles\Box 172\3\  img094
Date  16th September 1926
  
RR 758 (10M) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225
ORIGINAL
COMPLETED 19.10.26
STANDARDISATION of CHASSIS PARTS.
Date 16.9.26
No. 4653
Drawing No. D.51403
Description of Parts: IGNITION COIL WITH FINER PRIMARY WINDING (REDMANOL CASE) (25 SWG.)
Origin: Improvement of current consumption and effect of platinum contact points.
Experimental Test Report:
See EFC2/T4.3.26 - in addition to which there has been completed on 20 HP. 10-G-3 a 10,000 miles test of such a finer primary coil with Redmanol case, with entire satisfactory results.
There has now been completed a satisfactory 10,000 miles test on 40/50 HP. chassis 12-EX.
Road Test Report:
The platinum points remained in good condition.
There was no trouble in both cases with the coil which gave good results during the tests.
Part List:
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C [X] Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part. £
Weight of New Part. £
Difference per Car: Nil.
Cost of Old Part. £
Cost of New Part. £
Difference per Car: Negligible.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.....£......
Series.....£......
Signature of Mr De LOOZE that above is correct. My/Rb{R. Bowen} 18.9.26
SIGNATURES | DATE | REMARKS
MR. C.W.B. | 18.9.26 | Agreed. CWB.
MR. B. JOHNSON | 18.10.26 | Agreed. B.Johnson.
MR. ROYCE | 19/9/26 | Agreed. FHR.
MR. WORMALD | 22.9.26 | Agreed. Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 14.9.26 | Agreed. Rg.{Mr Rowledge}
MR. DAY | 16.9.26 | Agreed. Da.{Bernard Day - Chassis Design}
MR. BAILEY | 17.9.26 | Agreed. BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD | 16.9.26 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT | 18/9/26 | Agreed. AE.
MR. NORTHEY | 18.10.26 | Agreed. PN.{Mr Northey}
MR. HIVES | 16.9.26 | Agreed. Hs.{Lord Ernest Hives - Chair}
[Green Stamp: PHANTOM CHASSIS]
  
  