Instructions for mounting a new HP pump to a 10,000 Miles Chassis.


Identifier  ExFiles\Box 108\1\  scan0002
Date  15th July 1937
  
To HPS. {Horace Percy Smith - Experimental Factory Mgr}

600a

Rm {William Robotham - Chief Engineer} /JBD. {John B. Dixon - Fuel Systems} 8/JH.15.7.37.

24-G-VI 10,000 Miles Chassis.

Will you please have the H.P. pump I will supply mounted on the O.S. front engine foot to LeC. 5772 on the above chassis. This scheme shows a large AC mechanical pump as this pump is not available the existing T type pump will be utilized instead. The SU petrol pump to be left on the dash but pipes and wiring disconnected

The new parts required are

1 Sheet steel bracket.
1 flexible pipe.
1 pipe junction to carry flexible pipe.

Alterations to pipe work and wiring, the latter to be connected up to the A position on the trial switch . This is to be fitted before the car goes to France.

Rm {William Robotham - Chief Engineer} /JBD. {John B. Dixon - Fuel Systems}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙