Action points for the development and production of the 20/25 model.


Identifier  ExFiles\Box 174\3\  img072
Date  29th January 1936
  
-4-
HS {Lord Ernest Hives - Chair} /RM. {William Robotham - Chief Engineer} 20/HS. {Lord Ernest Hives - Chair} 29.1.36.

20/25 Hp.

(1) Swindall will get the die-cast pistons fitted to G-14, also the 11" clutch with the strengthened bolts, and run an endurance at 4,000 r.p.m. to clear for 20/25 production as soon as possible.

(2) Smith should follow up the design for the improved oil seal on 20/25.

(3) Swindall should obtain the latest valve gear parts for 21-0-IV and 22-3-V. {VIENNA}

(4) Steadman should co-operate with Hancock and state definitely whether we can go into production with the big bore 20/25 without unbalanced radiator shutters or not.

(5) Hancock should follow up the looking of the Hartford damper on the servo T lever.

(6) Hancock should follow up the sticking of the accelerator pump and the position of the throttle closing spring on the Stromberg carburetter, and make definite recommendations for production.

HS {Lord Ernest Hives - Chair} /RM. {William Robotham - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙