Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The removal of four bosses on the Bentley III front suspension forging.

Identifier  ExFiles\Box 87\4\  scan0144
Date  7th December 1936
  
To BY.{R.W. Bailey - Chief Engineer}
Copy to Da.{Bernard Day - Chassis Design}
Rm.{William Robotham - Chief Engineer}
RHC.{R. H. Coverley - Production Engineer}
HPS.{Horace Percy Smith - Experimental Factory Mgr}

E/Ev.{Ivan Evernden - coachwork}1/MN.7.12.36.

246

LES

Bentley III Front Suspension.

We confirm our conversation with BY/SS{S. Smith} that we wish to remove the four continuous bosses on the main suspension forging shown on N.Sch.4927, which were to be used for the attachment of the wing stay and head lamp standard.

It is our intention to have the wings and lamps mounted on the radiator, and these bosses would not be required for such a scheme. If, however, we revert to the wings and lamps mounted on the frame and subsequently require these bosses it would merely necessitate a modification to the die. We think it is better to leave the bosses off at this stage than to put them in, as once the die is sunk for them they would have to stay whether they are needed or not.

Would you kindly arrange to have the bosses removed from the details.

Ev.{Ivan Evernden - coachwork}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙