The testing and standardisation of road springs for the 20/25 HP chassis.
| Identifier | ExFiles\Box 106\1\ scan0352 | |
| Date | 10th September 1935 | |
| Hs. {Lord Ernest Hives - Chair} 4546 BY {R.W. Bailey - Chief Engineer} /Cgh. {W Clough} 1/G.10.9.35. 20/25 HP. CHASSIS - ROAD SPRINGS. In accordance with instructions received from Sg. {Arthur F. Sidgreaves - MD} we ordered six sets of front and rear road springs with a rating between present standard normal type and the flexible type in order that they may be tested out and standardised with a view to fitting them on 20/25 HP. chassis to be sent permanently abroad. One set was sent to Paris for them to try on their Demonstration car, and we attach copy of their report to Sg. {Arthur F. Sidgreaves - MD} as a result of which Sg. {Arthur F. Sidgreaves - MD} has told us to arrange for same to be standardised as soon as possible. To put the matter on a proper basis we consider that the usual standardisation sheets should be circulated. The piece numbers of the springs are :- [Table with handwritten headers] initial deflection | Shackles | | Normal | Max Bump 2.650" | F.60971 | Front. | 28.3 | 43.6 5.650" | F.60977 | Rear. | 26.3 | 48.4 [Handwritten notes] LES Please go over the stress on these springs. We must run a pair of springs on the bump. By {R.W. Bailey - Chief Engineer} /Cgh. {W Clough} I am circulating a standardisation sheet - but want 50 hrs bumping before they get to the customer. Rm. {William Robotham - Chief Engineer} O.K. Movement Ratings Initial Deflection Front 2" Rear 5½" Shackles to 2 | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
