Standardisation of chassis parts concerning the fixing of a spring in an air valve to improve reliability.


Identifier  ExFiles\Box 171\1\  img013
Date  11th January 1926
  
RR 755 (10M) (DB {Donald Bastow - Suspensions} 130 12-9-24) MS 301225
ORIGINAL COMPLETED 22.2.26.
STANDARDISATION of CHASSIS PARTS.
Date 11.1.26.
X No. 8030

Description of Parts: FIXING OF SPRING IN AIR VALVE.
Origin: To improve reliability.

Experimental Test Report.
It is propose to revert to the original fixing of the spring in the air valve to the top cover by means of a screw. The present arrangement of pushing the top coils into a recess is not reliable.

Road Test Report.
Fitted to 10-G-111 - run 12000 miles.
Fitted to 10-EX - run 800 miles.
A similar scheme was fitted to all Silver Ghost1907 40/50 historic RAC 15,000 miles trial cars.

Right side box:
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 1. 4d. 20 HP. £ 1. 10d. 40/50 HP.
Cost of New Part. £ 2. 0d. 20 HP. £ 2. 5d. 40/50 HP.
Difference per Car. 8d. 20 HP. increase. 7d. 40/50 HP. increase.

Cost of Parts in Works which will be scrapped if commenced on:-
Series ...... £ ......
Series ...... £ ......
Series ...... £ ......

Signature of Mr. DE LOOZE that above is correct. My Ruls. Remarks.

SIGNATURES | DATE | REMARKS
MR. JOHNSON | 22.2.26 | Agreed. C. Johnson.
MR. B. JOHNSON | 22.2.26 | Agreed. B.J.
MR. ROYCE | 15/1/26 | Agreed F H R
MR. WORMALD | 11.1.26 | Agreed. Wor. {Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 11.1.26 | Agreed. Rg. {Mr Rowledge}
MR. DAY | 13.1.26 | Agreed. Da. {Bernard Day - Chassis Design}
MR. BAILEY | 12.1.26 | Agreed. BY. {R.W. Bailey - Chief Engineer}
MR. PLATFORD | 13.1.26 | Agreed, as spring clearance does not remain constant, carb. unreliable, advise retrospective action. EP. {G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT | 17.2.26 | Agreed. E. {Mr Elliott - Chief Engineer}
MR. NORTHEY | 13.1.26 | Agreed. PN. {Mr Northey}
MR. HIVES | 19.2.26 | Agreed. E. {Mr Elliott - Chief Engineer} Hives.

[Green Stamp] O.H.P. CHASSIS ACTION
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙