The procedure and timeframe for testing a cleaner using a suction blower.


Identifier  ExFiles\Box 159\6\  scan0086
Date  25th August 1940
  
Rm {William Robotham - Chief Engineer} /GB.1/ET.25.8.40 - 4 -

A suction blower will be set up on the H.R. machine and air will be drawn from the shop through the cleaner. If shop air turns out to be too clean, a means of producing dust laden air will be devised.

It is estimated that tests on a cleaner will take from 2 or 3 days to as many weeks (assuming that shop air is used).

Rm {William Robotham - Chief Engineer} /GB.
  
  