Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
List of machines and costs required for producing springs.

Identifier  ExFiles\Box 43\2\  Scan077
Date  28th October 1925
  
COPY.

October 28, 1925.

To Mr. Beaner
From Mr. Nadin.

LIST OF MACHINES REQUIRED FOR
PRODUCING ROLLS-ROYCE SPRINGS.

1. Alligator Shear. $1,450.00.
2. Small Furnace. 500.00.
3. Taper Rolling Mill (second hand) 950.00.
4. Trimming Press. 2,850.00.
5. Large Furnace. 1,250.00.
6. Rig with Tank for Forming Plates. 200.00.
7. One No. 6 Blount Grinder. 200.00.
8. One No. 3 Gardner Buff arranged for
band polishing. 170.00.
9. One Bull-Doser 1,100.00.
10. One Eye Rolling Machine (hand operated) 350.00.
11. One Hand assembling Press. 375.00.
12. Anvil and Plate for Fitters. 160.00.
_________
$9,555.00.

To the above sum must be added,
say 25% for Transportation and
Installation 2,388.00.
_________
Total cost .................... $11,943.75.
=========

T.N.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙