From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
List of instruments required for production adjustment or testing of electrical systems.
Identifier | ExFiles\Box 165\3\ img007 | |
Date | 10th January 1929 | |
X.975 60033 10.1.29. X.1628 Production Test. INSTRUMENTS REQUIRED FOR PRODUCTION ADJUSTMENT OR TEST. X.975 X 178 2 Instruments. Lighting. { Dynamo. Cut-out. Battery. } 15 volts and 15 amperes. (combined) Starting. { Motor } 15 volts and 150 ampere. (separate) { Main switch. Actuator box. Push button switch. } one instr't { 1.5 & 15 volts and amperes). (combined isenthal resistance) 1.5 & 15 volts and amperes).(combined) } Ignition. { Coil and ballast. Condenser. and coil. Distributor. } 1.5 and 15 volts and amperes.(combined) Weston model 370 A.C. milammeter. to 30 m.a. | ||