From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Contract modifications, delays regarding a modified chassis, and a meeting with the War Office.

Identifier  ExFiles\Box 180\M5\  img008
Date  13th October 1920
  
-2- Wor{Arthur Wormald - General Works Manager}4/M13.10.20.

still be very doubtful from a point of view of quality, and
that our scheme of designing parts, whilst being longer,
would be in the long run better, and could be fitted later,
and that the War Office by adopting such a policy would be
making a very safe move.

The Committee think that it is wise for me to come along
to London tomorrow with Mr.Day, in order that we may possibly
help to clear up the difficulties.

In considering this memo, two important factors should
be taken note of, - firstly the War Office are responsible
for delays incurred with the modifications because a number of
these modifications have been put before us after the contract
had been arranged, and secondly - the Works were not asked if
they could complete these modified chassis by November 21st.,
prior to the contract being arranged.

I attach to Mr.Royce's memo, copy of BJ12/H12.10.20.


WOr.{Arthur Wormald - General Works Manager}




Enc. Specification.
Also to H.{Arthur M. Hanbury - Head Complaints} - Copy BJ12/H12.10.20.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙