Rolls-Royce Archives
         « Prev  Box Series  Next »        

Actions required following a 10,000-mile test run and inspection of chassis 12-EM.


Identifier  ExFiles\Box 53\4\  Scan048
Date  11th December 1923
  
X4601

To E. {Mr Elliott - Chief Engineer} for R. {Sir Henry Royce} from Hm. {Capt. W. Hallam - Head Repairs}
" Wor. {Arthur Wormald - General Works Manager}
" BY. {R.W. Bailey - Chief Engineer}
" Hs. {Lord Ernest Hives - Chair}
" Wd. {Mr Wood / Mr Whitehead}
" S.

C & B.J.

Chassis No. 12-EM.
10,000 Miles Test Run.

Attached is copy of BJ4/H7.12.23.

In addition to the full report on the condition of chassis 12-EM after dismantling and inspecting, there are several other points dealt with in Hm {Capt. W. Hallam - Head Repairs} 1/W29.11.23 in regard to which we now ask for the necessary action to be taken, in accordance with BJ's instructions.

Para. 3. Already settled by S.
Para. 4. -do-
Para. 5. S. to instruct if advisable.
Para. 6. For attention by BY. {R.W. Bailey - Chief Engineer}
Para. 7. In view of test no action required.
Last para. For research by Experimental Dept.

With reference to memo marked "B" attached to Hm {Capt. W. Hallam - Head Repairs} 1/W29.11.23, this is chiefly in connection with the Instruction Book and the whole of it is for the attention of BY. {R.W. Bailey - Chief Engineer}

Hm. {Capt. W. Hallam - Head Repairs}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙