Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Specification sheet for the 1st motion shaft bearings for the Phantom III chassis.

Identifier  ExFiles\Box 94\2\  scan0135
Date  18th December 1936
  
To. Rm{William Robotham - Chief Engineer}/Gry.{Shadwell Grylls} 18.12.36.

PHANTOM III. CHASSIS.

1st. MOTION SHAFT BEARINGS.

Dia. of Bore of Dia. of Outside Dia.
Shaft. Bearing. Housing. of Bearing.

FRONT BEARING. 1.9685+¼ 1.9685+1/10 * 3.5430+½ 3.5434-3/10
-2/10

* Housing is 3/10 tight
in Gearbox to 1/2 slack

REAR. 2.300+¼ 2.300+1/10 3.7489+¼ 3.7492-3/10
-2/10

Handwritten notes:
- To the left of 'FRONT BEARING': 1-3/10 Thou
- To the left of 'REAR.': 1-9/10 Thou
- Under 'Bore of Bearing' for FRONT: .450
- Under 'Outside Dia. of Bearing' for FRONT: .400
- Under 'Bore of Bearing' for REAR: .450
- Under 'Outside Dia. of Bearing' for REAR: 300
- Bottom right corner:
450
400
300
200
50
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙