Rolls-Royce Archives
         « Prev  Box Series  Next »        

Statistical report on component failures for the six months up to the September quarter across various engine models.


Identifier  ExFiles\Box 47\3\  Scan265
Date  5th November 1931 guessed
  
-19-

20 HP. 25 HP. Ph.I. Ph.II. TOTAL. GRAND TOTAL. REMARKS.

PROP. SHAFT SEIZED.
September Quarter. C.C. 1 1 - 1 3 3
W.P. - - - - }

Previous " C.C. - - - 1 1 1
W.P. - - - - }

Six months. 1 1 - 2 4 4

PROPELLER - OIL LEAKS.
September Quarter. C.C. 2 5 - 9 16 17
W.P. - 1 - - 1 } This job is now being improved by the Works during manufacture.

Previous " C.C. 1 1 - 9 11 13
W.P. - - - 2 2 }

Six months. 3 7 - 20 30 30

TELEGAUGE FAILURES.
September Quarter. C.C. - 13 - 44 57 64
W.P. - 2 - 5 7 } Generally speaking these instruments are not too reliable and further investigation is required.

Previous " C.C. 1 18 1 39 59 65
W.P. - 2 - 4 6 }

Six months. 1 35 1 92 129 129
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙