Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The standardization and implementation timeline for 20 HP vertical shutters.

Identifier  ExFiles\Box 105\1\  scan0014
Date  21th June 1927
  
RECEIVED
JUN 1927

X5250
c.HS.{Lord Ernest Hives - Chair}
BY8/H.{Arthur M. Hanbury - Head Complaints} 21.6.27.

20 HP. VERTICAL SHUTTERS.

In my memo BY4/H.17.6.27. I pointed out that whilst all the other copies had been signed, yours had not been signed, but that you had not received the Standardization Sheet owing to the fact that cost figures were not available, and I understand you do not get a standardization sheet until cost figures are attached to same.

I attach hereto copy of the standardization sheet and would like to know whether the conditions will justify you signing same or not. If you sign the sheet, the earliest date the Works can bring the shutters in is 101 in "L" Series. The first chassis on "L" Series will be put on test towards the end of September. This means that the first chassis with the new vertical shuttered radiator under this scheme will be approximately the commencement of the new year. If we do not bring it in at the second 100, then it will be approximately 13 weeks later than that at the proposed rate of production.

BY.{R.W. Bailey - Chief Engineer} [Signature]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙