Dispatch options and schedule for a dummy chassis required for EAC.11 bodies.
Identifier | ExFiles\Box 71\1\ scan0062 | |
Date | 22th September 1924 | |
To Hs.{Lord Ernest Hives - Chair} from RHC.{R. H. Coverley - Production Engineer} X8830 RHC{R. H. Coverley - Production Engineer}16/EU22.9.24. RE. EAC.11. X. 8830 X. 8250/60 X. 8770 With reference to the dummy chassis which is required for EAC.11 bodies, we could have a chassis ready for despatch a week hence if it would be accepted less radiator and bonnet. If this is not satisfactory, we could have radiator with shutters in unfinished condition by Oct. 2nd., a week on Thursday next, but at the same time, we should be glad if you would take up the question of bonnet with WW. as our D.O. are still awaiting instructions. RHC.{R. H. Coverley - Production Engineer} | ||