Work report for a supercharged chassis unit detailing running times, planned tasks, and required spares.


Identifier  ExFiles\Box 133\1\  scan0236
Date  29th June 1937
  
To HPS. {Horace Percy Smith - Experimental Factory Mgr}
c.c. to Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell}
c.c. to E {Mr Elliott - Chief Engineer} /PSN.

1129
Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards} 5/JH.29.6.37.

S/C Chassis Unit.

Running time for week ending Sat. 26th June 1937 - 18 1/2 hrs.
Fitting time for week ending Sat. 26th June 1937 - 11 1/2 hrs.

Work to be done.              Time.

Power & detonation on alum. head and block      1 day.

SHOP. Fit l/c block with 1.500" dia. RS. {Sir Henry Royce's Secretary} 340 exhaust valve, and inclined valve alum head with .010" gasket.

Detonation and power variation with back pressure      2 days.

SHOP. Fit standard Bentley.

Power & detonation                  2 days.

SPARES.
(1) Spare sets of valve parts.
(2) Re-conditioned alum T.H.

Rm {William Robotham - Chief Engineer} /Ed. {J. L. Edwards}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙