Programme of test bed work for Phantom III, Bentley, and Wraith engine units.
| Identifier | ExFiles\Box 155\2\ scan0038 | |
| Date | 18th January 1937 | |
| SECRET 1315 To Rm. {William Robotham - Chief Engineer} from Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} C. to Rm {William Robotham - Chief Engineer} /Mths. {Reg Matthews} C. to Rm {William Robotham - Chief Engineer} /OBS. Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} 10/AP.18.1.37. PROGRAMME OF TEST BED WORK. Further to memo Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} 1/R.30.12.36 No.5. Test Bed. PHANTOM III. No.14. Continental Unit. Water flow tests in accordance with Rm {William Robotham - Chief Engineer} /Std. On completion of the above a deristricted hot spot to Mod.2. Rm. {William Robotham - Chief Engineer} 295 will be ready for trial. This consists of cutting out the sharp bends and should be tried with standard carburetter to see if any improvement has been effected. A further hot spot Mod.1. Rm. {William Robotham - Chief Engineer} 295 has been modified to suit the fitting of 2, 25/30. carbs, also to be tried out. BENTLEY B.19. Endurance as in previous memo. Record of tappet clearances to be taken. If O.K. after 10 hours full throttle and 10 hours 1/4 load unit to be returned for examination of bearings. B.17 Unit with W/M. mains as in the last run. New big end bearings in AC.5.S. with RR.56.shims. 10 hours full throttle and 10 hours 1/4 load endurance to be run on Ethyl. No.30 Bed. WRAITH. W.1.Unit New unit is 25/30 other than lubrication layout and increased inertia damper. To be tested is usual procedure for fitting in Wraith Chassis. continued. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
