Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Manufacturing operations and cost breakdown for a Bentley Pedal Gap Plate, part number FB.3204.

Identifier  ExFiles\Box 148\5\  scan0371
Date  12th July 1938
  
PEDAL GAP PLATE - Cont'd.{John DeLooze - Company Secretary}

BENTLEY

The Bentley Gap Plate, FB.3204 is of single piece construction, being at present sandcast at R.R.
The total foundry time is 144 minutes, and the material cost is 4/2d.

The operations are as follows :-

OP NO. | OPERATION | SETTING TIME | TIME ALL: | COST
1. | Drill five holes in flanges, 4 small holes & 4 holes in large flat face. | 15 m.{Mr Moon / Mr Moore} | 3 m.{Mr Moon / Mr Moore} | ½d
2. | Drill all inclined holes & countersink. | 15 m.{Mr Moon / Mr Moore} | 15 m.{Mr Moon / Mr Moore} | 1d
3. | Csk. holes in flanges & 2 holes in flat face. | | 2 m.{Mr Moon / Mr Moore} | ½d
4. | Tap. | | 1½ m.{Mr Moon / Mr Moore} | ¼d
5. | Mill angular face. | 30 m.{Mr Moon / Mr Moore} | 12 m.{Mr Moon / Mr Moore} | 2¼d
6. | Mill groove | 45 m.{Mr Moon / Mr Moore} | 15 m.{Mr Moon / Mr Moore} | 2¾d
7. | Mill boss face. | 30 m.{Mr Moon / Mr Moore} | 5½ m.{Mr Moon / Mr Moore} | 1d
8. | Remove burrs. | | 5 m.{Mr Moon / Mr Moore} | 1d

£. s. d.{John DeLooze - Company Secretary}
Material Cost.................. 0. 4. 2.
Direct Foundry Labour Cost... 0. 2. 3.
Direct Machine Labour Cost... 0. 0. 9¼d
Charges...................... 0. 6. 0½d.{John DeLooze - Company Secretary}
TOTAL FACTORY COST............0. 13. 2¾d
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙